Boeing 787 Register - Welcome
|
 |
|
Model |
787-9 Dreamliner |
|
Status |
Active |
|
Serial
Number |
38798 |
|
Role |
Passenger |
|
Line
Number |
823 |
|
Engines |
RR Trent 1000 |
|
First
Operator |
EgyptAir |
|
Secal |
|
|
Current
Operator |
Egypt Air |
|
ModeS |
|
|
|
|
|
Date |
Detail |
Config |
Operator |
Reg |
Status |
2016-12-01 |
Assigned as ZE195 |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2016-12-01 |
Due to Egypt Air |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2018-02-18 |
Rolled out (New Aircraft) |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2019-01-28 |
Powered by Rolls Royce Engines |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2019-01-28 |
Built at Everett |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2019-01-28 |
Entered Final Assembly |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2019-03-09 |
Taxi tests only, B1 Cancelled due to unknown reasons |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2019-03-13 |
First Flight |
C30Y279 |
Egypt Air |
SU-GER |
On Order |
2019-03-28 |
Delivered to airline |
C30Y279 |
AerCap |
SU-GER |
Active |
2019-03-29 |
Leased to Airline |
C30Y279 |
Egypt Air |
SU-GER |
Active |
|