Boeing - 787-10, Serial Number 63515 Aircraft Summary
Model | 787-9 Dreamliner |
Serial Number | 63515 |
Line Number | 1053 |
Current / Last Operator | Juneyao Airlines |
Status | Re-Works |
![]() |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2020-08-19 | Build Type - Production Standard | W56Y282 |
Juneyao Airlines |
B- |
On Order |
2020-08-19 | Entered Final Assembly | W56Y282 |
Juneyao Airlines |
B- |
On Order |
2020-08-19 | Powered by General Electric Engines | W56Y282 |
Juneyao Airlines |
B- |
On Order |
2020-08-19 | Assigned as ZB989 | W56Y282 |
Juneyao Airlines |
B- |
On Order |
2020-08-19 | Built at Everett | W56Y282 |
Juneyao Airlines |
B- |
On Order |
2020-09-14 | Rolled out (New Aircraft) | W56Y282 |
Juneyao Airlines |
B- |
On Order |
2020-11-13 | First Flight | W56Y282 |
Juneyao Airlines |
B- |
On Order |
2020-12-01 | Stored at Everett | W56Y282 |
Juneyao Airlines |
B- |
Stored |
2023-12-13 | Stored at Victorville | W56Y282 |
Juneyao Airlines |
B- |
Stored |
2024-05-16 | Aircraft in re-works | W56Y282 |
Juneyao Airlines |
B- |
Re-Works |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | W56Y282 |
Juneyao Airlines |
B- |
Re-Works |