Boeing - 787-9, Serial Number 39659 Aircraft Summary
Model | 787-9 Dreamliner |
Serial Number | 39659 |
Line Number | 569 |
Current / Last Operator | Etihad Airways |
Status | Active |
![]() |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2009-01-01 | Build Type - Production Standard | C28Y271 |
Etihad Airways |
A6-BLN |
On Order |
2009-01-01 | Built at Charleston | C28Y271 |
Etihad Airways |
A6-BLN |
On Order |
2014-02-27 | Assigned as ZB105 | C28Y271 |
Etihad Airways |
A6-BLN |
On Order |
2017-04-17 | Entered Final Assembly | C28Y271 |
Etihad Airways |
A6-BLN |
On Order |
2017-05-02 | Rolled out (New Aircraft) | C28Y271 |
Etihad Airways |
A6-BLN |
On Order |
2017-06-01 | First Flight | C28Y271 |
Etihad Airways |
A6-BLN |
On Order |
2017-06-13 | New aircraft - Delivered to airline | C28Y271 |
Etihad Airways |
A6-BLN |
Active |
2019-11-15 | Painted in ADNOC - Choose Saudi Arabia Colour Scheme | W56Y282 |
Etihad Airways |
A6-BLN |
Active |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | W56Y282 |
Etihad Airways |
A6-BLN |
Active |
2025-01-06 | Rejected take off due to EGT overtemp, which caused tyres to burst on or after rejested takeoff. Aircraft was stuck on the runway for 14 hours causing airport to be closed. | W56Y282 |
Etihad Airways |
A6-BLN |
Active |